Delivering The Right Tiling in Demanding Constraints
Removing the old tiles and wood floor was not an option as this would involve major work and time was tight on this project.
So a decision was made to over-tile the floor using an anti fracture membrane beforehand then using a fully flexible rapid setting tile adhesive and grout.
On Time, On Budget As Planned
The floor tiling was installed over a 2 day period and this allowed the job to progress on schedule without delay to other trades and the customers new kitchen being fitted on time as planned!